Here's a list of things left to do on our current projects. Right now we're trying to finish the second floor. As you can see, we've got a long way to go! As items get completed (quite slowly, I assure you), we'll write about the experience and link to the posts. These are listed by room in the order than I remember them, not necessarily the order in which they should be completed. I'll add decorator-y stuff later; this is just the construction list.
Girls' bedroom:
1. Clean out tools
2. Sand closet drywall
3. Paint walls
4. Install ceiling fan
5. Install switches
6. Install closet light
7. Wire outlets
8. Install outlet and switch covers
9. Make and install door trim
10. Install crown moulding
11. Install baseboards
69. Install closet shelves and rods
Guest bedroom:
12. Window trim
13. Install switches
14. Install outlets
15. Install outlet/switch covers
16. Hang stairwell door
17. Crown moulding
18. Door trim
87. Attic access door
102. Hang door
103. Install baseboards
104. Board and batten on west wall
Girls' bathroom:
Guest bedroom:
Girls' bathroom:
34. Install exhaust fan
35. Install outlet/switch covers
37. Tile walls
41. Install shower fixtures
106. Grout wall tile
107. Crown moulding
108. Install toilet
Laundry/closet:
44. Build closet organizers
48. Install baseboards
Master bathroom:
49. Pour shower pan
50. Install backerboard in shower
55. Frame for shower niche
56. Tile shower
57. Door jambs
58. Baseboards
59. Board & batten
Master bedroom:
62. Door trim
64. Crown moulding
65. Baseboards
66. Trim in niche
Loft:
75. Install flooring
76. Refinish floors
77. Make recessed shelves
78. Make access doors
79. Install access doors and trim
80. Replace or repair windows
82. Wood plank walls
83. Wire outlets
84. Install outlet and switch covers
85. Baseboards
86. Other trim (outside corners)
Upstairs Hallway:
94. Make/install door trim
95. Install spiral staircase to loft
96. Feather in flooring
99. Install crown moulding
100. Install baseboards
101. Repair stairwell plaster