Tom was feeling ill today, so I worked alone at the house and finished up some small tasks that I could do by myself. First, I finished the water heater. I'm still not totally happy with the result, but it will have to do for now.
Before:
Before:
The rag is there to catch any drips from the pipe, which had already been cut.
After:
I don't like the deep bend in the hot-water hose, but I couldn't get the metal nipple out to replace it with a shorter one. Maybe I can see if Lowe's has a shorter hose instead.
I mentioned before that I found the missing "8" in our house number. I cleaned it up and put it back in its place above the porch. The bracket that holds it is pretty rusty and broken in a couple of spots, so I'll probably have to find a replacement for that before too long. But it's up, so now maybe the postman will deliver our mail.
Tomorrow: closet drywall. And leak testing.
I mentioned before that I found the missing "8" in our house number. I cleaned it up and put it back in its place above the porch. The bracket that holds it is pretty rusty and broken in a couple of spots, so I'll probably have to find a replacement for that before too long. But it's up, so now maybe the postman will deliver our mail.
Tomorrow: closet drywall. And leak testing.