26 October 2010

On the fence.

I've eliminated a lot of fencing options, but there are still plenty of designs and variations left to ponder. First there's the fence panel shape to consider. There's curved concave:


stepped concave:


convex:


and straight:



Then there's the post style. You can choose to add moulding:


cut the ends:


add a cap:


or a finial:


or cut it lower than the pickets so it all but disappears:


And if that wasn't enough, you still have to decide on pickets. There's dog-eared pickets:


gothic style pickets:


pointed:


and flat:


and any shape you can imagine:

not to mention your choice of picket width and spacing. You can even alternate picket heights:


Is it any wonder that I get utterly overwhelmed with the choices?

25 October 2010

The plan

After much nagging insistence, I finally convinced my sister, a landscape designer, to draw up a plan for my new flower bed. My requests:

1. Peonies! Beautiful, beautiful peonies. I love the big blooms and am fortunate enough to live in a perfect climate for growing them.

2. Low maintenance. Do I even need to explain why?

3. No reds or deep pinks to clash with the brick of the house and flower beds.

Here's what she came up with:


I don't know if you can read the labels, but the big pink circles are peonies, the green is iris, the yellow is tulips, and the blue is crocus. Since she didn't do any specs for exact varieties of the plants, it was up to me to make sure I selected plants with different bloom times. March blooms:


April blooms:


May blooms:


I couldn't find peony root stock locally, so I ordered those online. I got two different varieties, the Solange:


and Sarah Bernhardt:


Hopefully all the colors will work together and not fight each other for attention. My mom assures me that "peonies thrive on neglect," so it might be something even I can manage. I can't wait for spring to show them off!

22 October 2010

Tah dah!

Building this tiny little wall (a measly 50 linear feet) has taken so long I can't even remember when the whole process started. Alas, the bricks are done. There is still much to be done, so this isn't a true before-and-after. I still have to build ANOTHER one and build the fence. Hopefully I've learned enough from the first raised bed to make the next one go faster. Anyhow, here's how it looked before:


And here is the much-anticipated wall in all her glory:


Yeah, pretty unimpressive for as long as it took me. I made lots of mistakes (like deciding to build this thing in the first place), but let's just call it charm, shall we?

11 October 2010

Nope, still not done.

I've had a lot of people stop by to check on the progress of our little project. As it has been built, reactions have evolved from, "What in the heck is that?" (when we were digging the trench) to "Are you building a flower bed?" to "You sure know what you're doing!" to "Are you for hire?" and "You've been out here all afternoon. Here's a cold Pepsi to drink." That's a good sign, right?

06 October 2010

This is not an update.

I'm only half-breaking my promise not to update until the wall was completed. It's been cold and rainy here, so building the wall has been a no-go. However, I did get a visit on Monday afternoon just as I started working outside from a previous owner! I could tell he is the sort of person who loves to talk and tell stories, so I picked his brain about the house. Some things I found out:

1. The bricks we've been digging in the yard weren't there originally.

His brother (who is now 66) installed them, so they've probably only been there for 30 years. Yeah, *only* 30 years. The family owned a construction business (the largest in town at the time), and whenever they had to dig up roads or alleyways, he'd gather the bricks and use them in the yard. That explains why there are so many different stamps on the bricks.

2.
The bricks that I found more recently, buried next to the sidewalk, simply lined a flowerbed. The flowerbed contained 4 rosebushes, 2 of which still exist.

His green-thumbed grandmother planted them, and they're over 100 years old.

3. I speculated that the side porch was not original, due to the different mortar thickness and color and the fact that it's not integrated into the pilaster very well.

I was partially right. He told me that a drunk driver ran into it, but that it was rebuilt the way it was. So, the work is new (relatively), but the design and materials are original. He also said that the original owners had run short on money when building the house next door, so their porches were done in wood instead of brick.

4. A mysterious pole in the side yard, that our neighbor warned us could be a vent (for what I don't know) and we therefore shouldn't remove it, is just part of an old clothes line. It's probably not even anchored in cement, so it should come out pretty easily.

5. According to him, the state gave them virtually no time to clean out the house before a forced sell date. I can only assume there were back taxes owed on the property. He said they threw out all sorts of historically significant items, including original blueprints to local landmarks (remember, his family owned a construction company) including the stadium (the original home of what is now the Detroit Lions). Being a lover of historic architecture, knowing these were thrown away breaks my heart.

And the absolute BEST part is that he's going to give us some old photos of the house and surrounding area! I may be a total architecture nerd for loving such things, but I won't apologize for it.

03 October 2010

Are we there yet?

Here's how it's looking now:

Leveling each brick is tedious.

We were rained out today (rain also cut our work short yesterday), but I look forward to finishing the first course soon. Hopefully tomorrow, if weather permits. No more pictures or updates until it's done...so I'll see you in a few years.

28 September 2010

Rain delay

Tamping the soil got delayed due to the rain we've had the past couple of days. This rain helped transition temperatures from blistering hot to unseasonably cool in a snap. I can't complain, though. I'd much rather do yard work when it's cool outside!

Anyhow, we got a break in the weather and I got out there and tamped the soil. Tamping reduces the amount of soil settlement once the wall is built, which could cause the whole thing to topple. Then I dumped gravel into the trench to about a 2" depth, staying roughly level, and tamped again.

Since I'm not digging beneath the frost line, having gravel under the wall helps drain water and prevents frost heave.

I should also say here that I prepared for fence posts in a somewhat unusual way. I laid concrete blocks at the corners on top of the gravel, leaving room for the brick in front. I put one half-block (free from Lowe's) on top of a full block, aligning the cores and bonding them together with construction adhesive.

Always helps to have a baby with you when asking for broken items for free.

The 4x4 treated post will be placed in the core and backfilled with gravel, tamping as I go. Believe it or not, you don't have to set your fence posts in concrete. Having the wood against gravel rather than concrete or soil also provides better drainage and will hopefully extend the life of the fence. (Green note: LEED for Homes awards 1/2 a point for eliminating wood-to-concrete connections as part of Nontoxic Pest Control, so maybe there's something to this method after all.)

I have to wait to place the second set of these concrete blocks on the far end because I wasn't sure exactly where the end of the wall would fall. We don't want to have a cut brick on the end of the run. We 'll lay the first course of brick and then place the block at that end. The intermediate posts will be done after this step to ensure even spacing.

After the block was set, I laid a 2" layer of sand on top of the gravel, leveling it carefully. This provides an even base for the brick, and it's easy to accommodate small variations in the brick size by adding or removing sand under each brick.


That's as far as I've gotten so far. I'm working during the day while Clara naps. With the exception of one or two hours of digging, I've done this all myself while Tom's at work, including buying the materials. If I get the first course laid this weekend, I should have the rest of it done by the end of the week. Presumably if I take the time to do a thorough job with leveling the first course, the rest should go up easily.