Showing posts with label bathroom. Show all posts
Showing posts with label bathroom. Show all posts

28 May 2014

One Room Challenge - Wrap-up

You might have guessed by the radio silence that things did not end well for the One Room Challenge. Not even close.


I'm certainly several steps closer to completion, but even at the beginning I knew it was an unrealistic goal. There was just too much life happening - road trips, holidays with family, sick kids. And I'm okay with that. Well, I could have done without the sickness, but we're all back to normal now.

Despite the utter failure of this experiment, I'd be willing to do it again. Just in a room that doesn't require plumbing. Plumbing is the worst.

06 April 2014

One Room Challenge - Week One

White hex tile floor with silver grout
The bathroom floor is done! And it didn't take 2 years to get it grouted! I used Mapei's Silver grout with the hex tiles. I would have been happy to go a tad darker, but a darker color would have drawn too much attention to my less-than-perfect tile installation. 

Grouting the floor was holding up the rest of the bathroom; the toilet, vanity/sink, and door trim all depended on its completion. I also grouted the walls adjacent to the (eventual) toilet, since that will be difficult to reach once the commode is installed. Grouting is a long - though not difficult - process, so that's it for week one!

03 September 2011

Frugal Fri...er, Saturday

I've been feeling a little uninspired for Frugal Friday lately - it's hard to feel frugal when you see dollar signs racking up above the heads of your construction crew. Tom participated in a 5k run this morning, so Clara and I hit a few nearby yard sales while he ran. As I mentioned before, I've been thinking a lot about the fixtures and finishes for the second bathroom. Pretty, affordable, and appropriate is apparently hard to come by in a new light fixture. I found several options and wasn't crazy about the prices, but I would have ponied up the dough anyway. These were the contenders, just to give you an idea of what I was going for:


Didn't like the chrome, and it was probably too mod for the house anyway. Sparkly and pretty, though.
$80.36



Top contender because of its price. Simple but appropriate.
$41.17



Probably my favorite aesthetically, but the most expensive and therefore least likely.
$96.76

As luck would have it, the second garage sale of the morning had a light fixture that I scooped up for $4. Of course it's used and not exactly like any of the options that I posted above, but I'm happy with the purchase.


I'll have to see how it looks in the space before I do anything to it, but I'll probably tone down the brighter brass with a little Rub n Buff. So the Frugal Friday tip (I know it took long enough for me to get to it) is to be flexible. Even if something isn't an exact replica of what you have in mind, it can still be great and save you money in the process! (And I bet you thought the tip would be to go to garage sales!)

28 February 2010

Progress and problems

Tom and I spent yesterday doing finishing-up projects in the bathroom while our hired help worked upstairs. As long as it took to do things before, it takes even longer now. I can't squeeze places I used to fit into easily, I can't climb up and down into the attic as readily, and bending from the waist causes more than a fair amount of discomfort. Despite that, we got a bit done. We hung 4 pieces of backerboard in the shower:

It's kinda dark in there now.

Now we can cut the greenboard to hang above those pieces and finish the mudding.

Then we had to cut nailer blocks for this outside corner of the shower. We had to rip a 45 degree angle off the corner of a 2x4. Our battery-operated circular required a fresh battery every 6 inches or so. Luckily our hired help had a corded saw that made short work of it, and we were able to install it without issue. That 2x4 nailer was the only reason we had not previously installed greenboard on the tub wall. Now that it's there, we cut and hung a piece to fit:

My pretty faucet is hidden away from the dust for the time being. I think this is also the tub's first appearance without the blue protective film along the edges!

We also installed a piece of drywall on the toilet half-wall and cut out the spaces for shelving and the access panel:


I bought the necessary escutcheon and valve for the toilet supply line, so I can probably install that soon and turn the water back on.

Meanwhile, one story above us...

Walls and slope all insulated.

"Are you done taking pictures for your blog yet?"


The un-insulated spacing is for an access door to storage space behind the knee walls.

There are a couple of issues we're going to have to address in the attic before drywalling can begin up there. I marked on the sole plate where I wanted to put outlets and communication (cable, ethernet, telephone, etc) boxes, but they only paid attention to the outlet marks. We need to take out a few batts of insulation and hang boxes for the missing communications receptacles. Also relating to that, we planned on running all of our communications for the whole house up to the cavity behind the attic knee wall (the left wall in the photo above) for a central hub. They isolated one of the sections we've already run for that (behind the wall on the right side of the above photo), so we'll have to connect those areas somehow. Seeing that this will be probably the next space to be finished, we might have to scrap the attic hub and put it in the basement instead. That would probably be better for protecting the equipment from heat, anyway.

The rafters that form the ceiling of the room also do not have insulation between them. We still have to run the dryer duct up to the roof vent (a 10-minute job if Lowe's would ever restock the materials I need to finish it) and hang and wire the recessed lights for the room. Tom and I will probably at least mark locations for the lights today, if not hang them and start wiring.

The last issue is the location of the second access door. For some reason, Donny thought it should go behind the area cut out for the spiral staircase. The slope of the roofline prevents an access door from swinging into the access area, so it must swing out. However, there will be a railing around the hole for the staircase. You'd barely be able to crack the door open, much less put anything back there or crawl back there yourself. So we'll just take out one batt of insulation and swap places with the space he left open. There's a lot of miscommunication that can happen when you don't have a drafted set of plans for workers to refer to. Until a few weeks ago, that wasn't really an issue because we were doing it all ourselves, and I could accommodate for issues as I went along. Having to coordinate what I'm working on with what they're working on and answering questions and picking up necessary materials and equipment and trying to explain that the junction box has to be accessible is enough to wear a pregnant lady out completely.

22 February 2010

More tile pictures

Here's the bathroom tile, all grouted and sealed:


We (I) picked a colored grout rather than plain black, white, or gray. It's called pewter and is a bit lighter and more silvery than the standard gray grout. It picks up the color of the veins in the tile pretty well. It's a little thing, but I think it makes a difference.

There's still a little bit of drywall work left to do in the bathroom, so I want to get that done this week. After that's done, I'll prepare the walls for priming (wiping them down with a tack cloth to get rid of the loose drywall dust). I want to do this before installing the toilet so it's not such a hassle to paint behind it. I should probably look into baseboards pretty soon for the same reason, even if that little section behind the toilet is the only place to have a baseboard for a while.

20 February 2010

Check and check.

We finally got two things checked off the to-do list featured on the side bar of the blog. Tom and I hooked up the water heater to the circuit breaker, and our hired help tiled the bathroom floor. They'll be back tomorrow for the grout. Here's a peek:

Donny said that he was "Christian cursing" us under his breath when he started, but that he had to admit it was a good-looking pattern.

We returned a few hours later to see if the water heater had done its job. And it works! No explosions, no floods! We are thrilled.

21 September 2009

It's about time.

We finally got the ceiling drywall hung in the bathroom, so we can move on to the walls next. We would have started that last night, but it was getting too dark to work in there. However, if we get just one piece on the wall tonight, I can wire up one of the vanity lights, enabling us to work after dark on the rest of it.

Our productivity plans may be taking another hit next week. The bosses are going out of town on business and leaving Tom and me in charge of their house, animals, and child for almost a week. In theory, I'll have between 8 am and 2 pm to work at the house while the kid is at school, but it's a well-documented fact that I don't really wake up before 10 am. I'm not sure if trying to finish drywall while in a coma is a good idea. I guess we'll see.

05 August 2009

Bathroom inspiration board

Here’s a picture board of the products we’re using in our master bathroom so you can get a better idea of what it might eventually look like.
Bathroom

Flooring: Porcelain tile from Lowe’s. Rialto Noce ($2.08 per square foot).
Sinks: Two pedestal sinks from Lowe’s. American Standard (Around $90, I think).
Tub: 42”x60” Whirlpool tub. Special order from Lowe’s ($798).
Toilet: Kohler from Lowe’s. ($168? I remember thinking it was a lot for a toilet).
Mirrors: Oval mirrors from Lowe’s ($50 each). I'll probably paint the frames a different color.
Sink faucets: Delta Victorian, 4” centers. One from Lowe’s, one from eBay. (I can't remember how much these were without sifting through my pile of receipts).
Tub faucet: Clawfoot style tub filler. From eBay seller wosmile ($98).
Vanity light: Royce Arc 3-light vanity bar from Lowe's ($59 each).
Shower fixture: Delta Victorian showerhead. One from Lowe's, one from eBay. (Again, I can't remember. Something like $120 each).
Plantation shutters: Not purchased yet. I'm waiting to put casements on the windows to ensure a proper fit. Mom says she can get them in Mobile for $8 each. I saw some in a junk shop in town for $18-20 each, but they had a very limited selection.
Wainscot: I'll do these myself using various mouldings rather than a kit. I just like the look and think it fits well with an old house.
Fabric: I haven't finalized this by any means, but I'd like something similar to this for the window treatments. This particular fabric is a Waverly pattern, $20 a yard at fabric.com.

I also haven't finalized a paint color. I tend toward cool colors, especially aquatic blue-greens and grays. A warm color might make sense, though, since this is where my long waking up process will take place every morning. I'll probably pick out window treatment fabric first and draw a wall color from that. It's a lot easier to match paint to fabric than vice versa.

Any tips or thoughts?

21 March 2009

To the batroom, Robin

We've shifted our focus for a while from the bedroom to the bathroom. The first step was putting down the underlayment for the tile, sheets of concrete board. That step is almost complete:

The 2x8s on the floor are the approximate locations of the shower wall enclosure. It's about a 4'x6' shower. The hole in the floor near the top of the photo is where the toilet goes. The tub goes under the window on the left.

We still have to finish the seams. It's very similar to finishing drywall seams - it just uses thinset mortar instead of drywall mud.

We've already picked out our tile and the pattern in which it will be laid. It's a porcelain tile, which is a form of ceramic, but it has a bit of a texture on the surface to simulate natural stone. Every tile is textured differently and has a little bit of color variation, too, which enhances the effect. Here's a close-up of the slight pitting effect on the surface:

You can also see the tumbled edge, which furthers its resemblance to natural stone.

We decided that we like this windmill pattern, but I can't decide if I like it square or diagonal.

Square

And in case you don't want to tilt your head at a 45 degree angle:

Diagonal

Tom doesn't care one way or the other. Installing it square would make it easier to include a perimeter border, but I'm not entirely confident the walls are perfectly perpendicular. Diagonal installation is often done in that sort of situation. It's easier for the eye to account for a discrepancy in the walls being a little out of square if the floor is laid diagonally. Lord knows I used that trick in my hand-drafted projects for school - I don't think anything I drew was ever perfectly square.

I'm still not entirely convinced I won't wish we'd used 1" square or hexagonal tiles, but I can't see spending $9-11 more per square foot of the stuff. I keep telling myself it's a whole lot fewer grout lines to have to clean with a toothbrush.

Also, before we lay this tile, I need to decide whether or not I'll splurge on the radiant-heat floors. I can get a system to fit in our bathroom for about $150. I really hate cold tile, especially in the bathroom where I'm likely to be barefoot. But, it's $150 I could save and spend on a lifetime supply of warm, fuzzy bathroom slippers. Thoughts?